A study to improve plant layout design for minimizing production costs

I I Al-Bayati 1 and S S Al-Zubaidy 2

Published under licence by IOP Publishing Ltd IOP Conference Series: Materials Science and Engineering , Volume 1067 , 4th International Conference on Engineering Sciences (ICES 2020) 5th-6th December 2020, Kerbala, Iraq Citation I I Al-Bayati and S S Al-Zubaidy 2021 IOP Conf. Ser.: Mater. Sci. Eng. 1067 012096 DOI 10.1088/1757-899X/1067/1/012096

Article metrics

1536 Total downloads

Share this article

Author e-mails.

[email protected]

Author affiliations

1 Mechanical Engineering Department, Kerbala University

2 Production and Metallurgy Department, University of Technology

Buy this article in print

Plant allocation and the costs of moving between workstations in production and manufacturing lines are among the most prominent factors affecting the total cost of production. Selecting appropriate work locations and distances between workstations is thus a key factor affecting the efficiency and productivity of a production line and thus the quality and cost of the final product. In this research, problems with a current plant layout are assessed with an eye to increasing productivity with minimum additional outlay. The aim is to improve the work flow in a pulley plant based on consequential planning of the plant layout, based on the assumption that the improved plant layout can reduce material flow distances, resulted in reduced costs of operation by about 5 to 10%.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence . Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Click through the PLOS taxonomy to find articles in your field.

For more information about PLOS Subject Areas, click here .

Loading metrics

Open Access

Peer-reviewed

Research Article

A study of the layout planning of plant facility based on the timed Petri net and systematic layout planning

Roles Conceptualization, Formal analysis, Methodology, Project administration, Resources, Writing – original draft

* E-mail: [email protected]

Affiliation School of Economics and Management, Dalian University of Technology, Dalian, Liaoning, China

ORCID logo

Roles Conceptualization, Resources, Supervision, Validation

Roles Data curation, Investigation, Project administration

Affiliation CRRC Dalian R&D Co., Ltd., Dalian, Liaoning, China

Roles Methodology, Supervision, Writing – review & editing

Affiliation Institute for Sustainable Industries & Liveable Cities, Victoria University, Melbourne, Australia

Roles Data curation, Software, Visualization

  • Hanwen Liu, 
  • Xiaobing Liu, 
  • Lin Lin, 
  • Sardar M. N. Islam, 

PLOS

  • Published: September 28, 2020
  • https://doi.org/10.1371/journal.pone.0239685
  • Reader Comments

Table 1

The purpose of this research is to solve the problems of unreasonable layout of the production plant, disorder of the logistics process, and unbalanced production line in discrete manufacturing plants. By analyzing the production process and characteristics, the timed Petri net model is constructed according to the function and connection of each production unit, which is then used to generate a FlexSim simulation model of the production plant logistics system with a simulation software. Therewith the FlexSim simulation model is used to simulate the original layout of the plant, and to analyse the simulation data synthetically to put forward an improvement strategy. Combined with the use of the systematic layout planning method to analyze the overall layout of the plant and logistics relations, we infer the relevant drawings between the production units and determine the improved layout of the facilities. Finally, by comparing the before and after improvement simulation results, it is verified that the combination of timed Petri nets and systematic layout planning is effective to ameliorate the layout of the plant facilities and the logistics system. This method makes up for the factors that traditional methods have not considered, achieves the goal of reducing the cross circuitous route of the plant and the idle rate of equipment, and improving the efficiency of production.

Citation: Liu H, Liu X, Lin L, Islam SMN, Xu Y (2020) A study of the layout planning of plant facility based on the timed Petri net and systematic layout planning. PLoS ONE 15(9): e0239685. https://doi.org/10.1371/journal.pone.0239685

Editor: Dragan Pamucar, University of Defence, SERBIA

Received: June 24, 2020; Accepted: September 11, 2020; Published: September 28, 2020

Copyright: © 2020 Liu et al. This is an open access article distributed under the terms of the Creative Commons Attribution License , which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

Data Availability: All relevant data are within the paper. Also, the information of the bearings are available from the protocols.io database (DOI: dx.doi.org/10.17504/protocols.io.bk2akyae ).

Funding: The CRRC Dalian R&D Co. Ltd. support in the form of salaries for author [Lin LIN], but did not have any additional role in the study design, data collection and analysis, decision to publish, or preparation of the manuscript. The specific roles of this author are articulated in the ‘author contributions’ section.

Competing interests: The CRRC Dalian R&D Co., Ltd. support in the form of salaries for author [Lin LIN], but did not have any additional role in the study design, data collection and analysis, decision to publish, or preparation of the manuscript. This does not alter our adherence to PLOS ONE policies on sharing data and materials.

Introduction

With the increasing degree of automation in China’s discrete manufacturing industry, the potential for improving the efficiency of processing procedures to reduce costs has been consequently narrowing. As the result the key to enterprise competition has gradually shifted to new areas, such as logistics technologies that is closely related to production [ 1 ]. Facility planning, as an important part of the improvement of the production logistics system, refers to meeting the necessary constraints in a certain production environment, and determining the reasonable layout form and location of the equipment according to the production goals [ 2 ]. For some large-scale equipment products, the transfer time between processes is long and the transfer costs are high. Wang and He shows a reasonable layout of the plant facilities can effectively improve the turnover rate of work in progress and parts, shorten the production cycle, and reduce the transfer cost by approximately 30% [ 3 ]. It has been widely used in manufacturing, medicine, education, and other fields since being proposed by Richard Muther in 1961. The systematic layout planning (SLP) method calculates the logistics between the production units on the basis of analyzing the five basic elements that affect the effectiveness of the system: P (product), Q (output), R (process flow), S (auxiliary department), and T (time). Naqvi et al. use the improved SLP to develop a new layout which reorganizes the production departments of multinational companies that produce diversified products to improve production efficiency [ 4 ]. Kumar et al. propose a Data Envelopment Analysis (DEA) Charnes Cooper & Rhodes (CCR) model with constant returns to scale (CRS) to implement the Lean-Kaizen method. This method is considered an effective method to improve the quality system in the fastener industry and contributes to industrial lean [ 5 ]. Liu et al. propose an alarm window layout method suitable for the diagnosis process. By using the SLP method to improve the human-system interface problem, the safety digital alarm window of nuclear power plant is designed [ 6 ]. Benitez et al. use cluster analysis combined with SLP to plan the report area of the radiology department, using medical experts as a clustering variable to re-plan department to improve the performance of the radiology department [ 7 ]. Tarigan et al. propose a ranked positional weight method combined with SLP to modify the production line of wood production and the handling track of material movement [ 8 ].

However, the traditional SLP method may be affected by the subjective experience and knowledge limitation when drawing the correlation diagram of the position of the operating unit. Therefore, the final layout design scheme cannot verify its scientificity and rationality. With the development of computer technology, an increasing number of studies have used SLP and simulation software, such as Flexsim [ 9 – 12 ], Witness [ 13 ], and Quest [ 1 ], to conduct research objects optimization, improvement and case verification. The use of computer technology to help generate new layouts has been valued by scholars. In order to predict the maximum energy of photovoltaic modules more accurately, Stojčić et al. establish a model based on the principles of the fuzzy logic and artificial neural networks and integrate it into the Adaptive Neuro Fuzzy Inference System (ANFIS). Using PVsyst software for sensitivity analysis, they have obtained better prediction results than mathematical models [ 14 ]. Sremac et al. propose that based on the input and output data of the research object, a hybrid method of artificial intelligence ANFIS is used to establish a model for the decision of economic order quantity. Then use simulation to conduct sensitivity analysis to verify the effectiveness of the model for different types of goods in the supply chain management [ 15 ]. Korde and Sahu conclude that with the assist of the SLP method, the layout of the manufacturing automotive parts plant is organized and analyzed. The results can be verified by using simulation to derive a new layout [ 16 ]. Deshpande et al. use Computerized Relative Allocation of Facilities technology (CRAFT) to improve the layout of manufacturing plants. It is proposed the use of Automated Layout Design Program (ALDEP) to reduce costs [ 17 ]. Sharafati et al. propose a hybrid ANFIS as a predictive model. Then the error index is used to run the simulation model to estimate the scouring depth downstream of the sluice gate to manage the irrigation system [ 18 ]. Suhardini et al. simulate material handling cost and processing time of Material Handling Evaluation Sheet (MHES) to obtain new planning layout evaluation and program selection, which reduced the material handling cost of building material manufacturers [ 19 ]. Simulation technology can simulate the actual operation of a logistics system and test the performance of the system with given. It can generate simulation reports including status characteristics (idle, blockage, etc.), the number of inputs and outputs, and the maximum waiting time to identify bottleneck processes and resources, and facilitate the selection of layout schemes and the verification of effects.

In recent years, there have been some methods describing the modeling of production logistics systems. Among them, the Petri net is proposed by Dr. Petri in 1962 has the characteristics of simple, easy-to-understand graphics, and strict and accurate mathematical functions [ 20 ]. It has clear advantages in describing the concurrency, conflict, resource sharing, and other uncertain situations of complex and dynamic discrete production systems [ 21 ]. Guo et al. propose an adaptive collaborative timed colored Petri net model of the production logistics system in the internet environment and demonstrated that the method is superior to the events-driving method [ 22 ]. Considering the movement path of the robot between base stations, Al-Ahmari et al. propose the use of time-delay petri net (TdPN) to optimize the robot motion controller in the robot scheduling problem, and demonstrated the effectiveness through a mathematical model [ 23 ]. Yianni et al. use Petri net to build model to inspect different modules. Based on the model, establish a powerful framework for managing railway bridge asset portfolios [ 24 ]. Uzam et al. propose a think-globally-act-locally method with weighted arcs (TGALW) for calculating liveness-enforcing weighted arcs in the general Petri net model, which is used to monitor the activity in the flexible manufacturing system [ 25 ]. Mejía et al. establish a combination model of colored and ordinary petri net to solve the integration and collaborative project management in the animation and video game (A&V) industries through the Graph Search algorithm [ 26 ].

Many international scholars have studied the setting layout optimization based on the SLP method and the modeling of production logistics system based on the Petri net theory, which have applied the simulation software to specific practical cases to solve the problem of facility planning. However, as the research continues to deepen, the issues involved become more complex. In the literature that has been consulted, it is found that these two parts are relatively isolated. This study uses a large-scale world-class wind power bearing manufacturing plant as the research object. Starts from three research aspects of modeling, improvement, and simulation. Firstly, the bearing production process model and logistics timed delay Petri net (TdPN) model are established through the analyses of the production process and logistics process of the research object. The validity of the dynamic behavior of the logistics system is verified by a mathematical model constructed on Petri net. Secondly, the SLP method is used to analyze the logistics intensity between each operation unit to obtain the improved layout. At last, a FlexSim visual simulation model is constructed. Based on the verification results of the Petri net, and under the premise of ensuring the validity of the simulation model, each processing procedure and equipment usage in the original layout and the new layout obtained by the SLP method are simulated and analyzed to determine if a bottleneck in production is an issue. In addition, improvement measures and opinions are proposed to make the plant logistics smoother and maximize the value of the plant logistics system.

Situation and problem description

The research subject is Wafangdian Bearing Company Limited which is a large-scale wind power manufacturing company located in Dalian, Liaoning, China. Data is collected without special permit. It encompassed an area of 14,592 square meters, of which the plant area was 76 meters long from north to south and 192 meters wide from east to west. There are nearly 500 managers and workers at all levels of the factory, working in three shifts. The company currently has 30 different types of products in progress for rotating pivot bearing of large-scale wind power turbine, such as spindle bearing, yaw bearing, pitch bearing, speed increaser bearing, drive reducer bearing and generator bearing, etc. With an annual production capacity of about 15,000 sets. The company’s current annual order is about 8,000 sets, with a capacity utilization rate of only 53%. One-third of the equipment has been idle for a long time, but the workshop space has been saturated, and excess equipment has caused detours in the workshop. The investigation find that in the initial stage of the factory establishment, only the bearing inner and outer ring processing production, assembly and anti-corrosion processes are carried out in other plants. After the company’s merger planning, the factory needs to complete all the processes from forging to machining, heat treatment, assembly, and anti-corrosion, among others. The production of parts and components directly affect the later assembly process. It is a typical production workshop with a mix of machining and assembly processes. The merger of the factories makes the layout of the production units very unreasonable, the logistics routes of the workshops are not smooth, and many long-distance handling activities are required. Also, unsatisfactory production rhythms and uneven production lines increase the flow of materials and logistics costs in the plant. The area of each production unit and the number of pieces of equipment are shown in Table 1 .

thumbnail

  • PPT PowerPoint slide
  • PNG larger image
  • TIFF original image

https://doi.org/10.1371/journal.pone.0239685.t001

Based on the data collected from the plant and Table 1 , the original layout of the plant is shown in Fig 1 .

thumbnail

https://doi.org/10.1371/journal.pone.0239685.g001

Facing the fiercely competitive market, the company adopts the one-piece production model, which meets customer needs and strengthen the quality traceability. However, it is not enough to win market orders based on high quality to change the company’s status quo, reasonably arrange plant facilities, and improve equipment utilization rate. Reducing workshop logistics costs and achieving lean production management of enterprises are necessary means as well.

For review this paper, the rest structure organization as follows. The bearing production process is analyzed to establish the TdPN model for the plant logistics system. After that, an improved layout of the plant is proposed based on SLP. Afterwards, a simulation model of the original layout is established by the TdPN model and FlexSim software interaction, then the improvement strategies are proposed. Lastly, combined the improved layout with proposed strategies, the improvement simulation model is established to verify the effective. A roadmap of the overall framework, analysis methods and models gives in Fig 2 .

thumbnail

https://doi.org/10.1371/journal.pone.0239685.g002

Modeling of plant production process and logistics TdPN model

The plant production system is a typical discrete event system that triggers the occurrence of events with events. Petri net is a network system model used to describe the combination of physical processes and systems which is an effective tool for discrete time modeling. It describes not only the structure, but also the dynamic behavior of the system. Methods hierarchical description and analysis of the properties of complex discrete systems are performed, and refinement is gradually achieved [ 27 ]. The basis of the bearing production TdPN model is the production process model. Taking spindle bearing as an example, the production process is analyzed and improved to lay the foundation for the next modeling and simulation.

Analysis of bearing production process.

Large-scale wind power bearings are mainly composed of four main parts which are inner ring, outer ring, rolling body and cage, and other auxiliary parts, such as seals, dust covers, and rivets. Bearing production mainly includes the two processes of inner and outer ring processing and fitting assembly. The inner and outer ring forgings are respectively processed through lathe machining, heat treatment/gear processing, drilling, and other testing auxiliary processing to form semi-finished products of the inner and outer rings. The semi-finished products of the inner and outer rings that have undergone grinding and other processing techniques must be cleaned and dried before final assembly. The following steps are sorting into sets, installing rolling elements, protective rubber ropes, seals, screws, and so on. After that, sandblast and spray-paint for corrosion protection and drying processes are followed. Finally complete removal the semi-finished seals, installation the seals, mounting screws, grease and other assembly and packaging processes to form the finished bearing products, which stores in the finished product warehouse. In actual production, the process as the basis for the standard process of production and plan scheduling is very detailed. For example, lathe machining includes ordinary lathe machining (lathe machining 1) and precision lathe machining (lathe machining 2). The main processes are shown in Table 1 . To facilitate the study, the modular modeling of its process according to the processing flow is shown in Fig 3 .

thumbnail

https://doi.org/10.1371/journal.pone.0239685.g003

Timed Petri net (TdPN) model for bearing plant logistics system.

TdPN definition . TdPN is first proposed by Ramchandani to analyze the performance of asynchronous concurrent systems [ 28 ]. TdPN is a 5-tuple ∑ = ( S , T ; F , M , DI ), where ( S , T ; F , M ) is a prototype Petri net. S = { S 1 , S 2 , ⋯, S n } is a set of finite place of ∑, T = { T 1 , T 2 , ⋯, T n } is a set of finite transitions of ∑; F is an ordered pair set consisting of an S element and a T element in ∑, which is called the flow Relation of ∑ Relation; M : S → {0, 1, 2, ⋯} is called a ∑ mark, the mark M 0 ( s ) represents the distribution of tokens in the warehouse in the initial state. R ( M 0 ) represents the set of all of the states that may occur during the system operation, and DI is the definition time function on transition set T , that is, DI: T → R 0 . When a TdPN is represented graphically, S n is drawn as a small circle, T n is drawn as a small rectangle, F is drawn as a directed edge and exists only between the small circle and the small rectangle, and M ( s ) is represented by a black dot in S n . The drawing of this description can refer to Fig 5 . For t ∈ T , DI( t ) = a means that the occurrence of transition t requires a unit time to complete. That is, when a mark M satisfies M [ t >, the transition t can occur immediately, but the occurrence of t ends only after a time units has elapsed. The above definition of TdPN violates the transient principle of transition. Therefore, in TdPN, for each non-transient transition can be replaced by a sub-net composed of two transient transitions and a time-valued place ( Fig 4 ).

thumbnail

https://doi.org/10.1371/journal.pone.0239685.g004

TdPN model . The production, processing, and assembly of bearings can be divided into several processes. According to the connection relationship between the processes and the duration of each process, combined with the basic principles of Petri net, a TdPN model of the bearing production process is constructed. The connection of three plants and two transitions represent that the work-piece completes one process and is ready to enter the next process ( Fig 5 ), where t i 1 represents the start of process i , t i 2 represents the completion of process i , and place s i means that process i is processing, and assigns a time value a i to storehouse s i , which means that from t i 1 , at least a i time unit must elapse before t i 2 can occur. s i 1 means that the workpiece is ready for processing, and s i 2 means equipment for processing s i it is usable or not.

thumbnail

https://doi.org/10.1371/journal.pone.0239685.g005

According to the analysis of the bearing production process outlined above, a TdPN model is established for the production logistics system of the bearing plant. The establishment of the TdPN has been a guiding role for logistics analysis, plant construction, facility layout, and actual production. Fig 6 is a TdPN model of the logistics system for the processing and assembly of the inner and outer rings of a bearing plant. This logistics system model is composed of an inner circle production line, an outer circle production line, and packaged wiring.

thumbnail

https://doi.org/10.1371/journal.pone.0239685.g006

The meanings of the symbols ( S , T ) in Fig 6 explain in Tables 2 and 3 which are the product processing time, waiting for status and equipment status ( Table 2 ), and the product processing status ( Table 3 ).

thumbnail

https://doi.org/10.1371/journal.pone.0239685.t002

thumbnail

https://doi.org/10.1371/journal.pone.0239685.t003

Due to resource shortage or congestion, system operation may be stopped, that is, no changes can be started; such a net is not liveness. Let ∑ = ( S , T ; F , M , DI ) be a delayed Petri net. If M ∈ R ( M 0 ) makes ∀t ∈ T : ¬ M [ t >, then M is called a dead marking of ∑. If there is no dead mark in ∑, then ∑ is called non-dead. In Fig 6 , the M = { S 1 , S 2 , ⋯, S 63 } T is identified, where S 1 , S 26 , S 51 is the input places and S 63 is the output place. The specific situation of the bearing plant is analyzed to obtain the initial mark M 0 = {1,1,0,0,0,1,⋯,1,1,0,0,0,1,⋯,1,0,0,1,0} T of the Petri net. According to the Petri net change rules, T 1 is changed under the initial mark, T 17 has the right to occur. If T 17 occurs, the status of the new system can be determined, that is, the new logo M 1 = {0,0,1,0,0,1,⋯,0,0,1,0,0,1,⋯,1,0,0,1,0} T . After 120 minutes, the inner ring forging precision lathe machining is completed, T 18 has the right to generate, M 2 = {0,0,1,0,0,1,⋯,0,0,0,1,0,1,⋯,1,0,0,1,0} T , at this time T 19 has the right to occur. The inner ring drilling is finished after 110 minutes, at this time the outer ring is still undergoing precision lathe machining of forgings. By analogy, the transition set is excited in turn, and M 40 = {0,1,0,0,0,1,⋯,0,1,0,0,0,1,⋯,1,0,0,1,1} T is obtained. According to the above analysis, both ∀ M ∈ R ( M 0 ) and ∃ M ’ ∈ R ( M ) in the model make M ‘[ t >, so the model is reachable, active, and bounded, which is convenient for simulation.

Bearing plant facility layout and simulation

Facilities layout optimization of bearing plant based on systematic layout planning (slp) method..

The SLP method obtains the logistics flow chart of the plant production system by analyzing the logistics process of the manufacturing process. Analyzing the problems in the layout of the plant facilities by using F-D (flow-distance) afterwards, and drawing a correlation diagram of the location of the production unit according to the logistics relationship to improve the plant logistics system. The closeness of logistics intensity between production units is calculated and the degree of precision is analyzed based on the floor plan of a large-scale wind power bearing manufacturer in Fig 1 , the distance between production units (approximately the location of each area at the center point), the scale of production (600 monthly production), and the production process ( Fig 3 ).

plant layout research paper

https://doi.org/10.1371/journal.pone.0239685.t004

Because there are a lot of logistics data in large bearing plant, five grades are introduced in the SLP method to describe the logistics intensity ( Table 5 ). When analyzing the logistics intensity, the movement sequence and movement volume of the logistics objects are determined, followed by taking the movement volume of the logistics objects within a certain period as the logistics intensity.

thumbnail

https://doi.org/10.1371/journal.pone.0239685.t005

The five levels of intensity are A (absolutely important), E (extremely important), I (Important), O (ordinary important), U (unimportant). Table 5 indicates that the more lines, the stronger the logistics intensity.

According to the classification criteria and the logistics intensity in Table 4 , the logistics intensity levels of each production unit can be analyzed which is shown in Table 6 . Each pair of units in Table 6 is calculated based on the data in Table 4 .

thumbnail

https://doi.org/10.1371/journal.pone.0239685.t006

Based on the vertical order of the workshops listed in Table 4 , the logistics intensity grade for each production unit is determined and presented in Table 6 . Hence, the correlations of the production units are classified in Fig 7 .

thumbnail

https://doi.org/10.1371/journal.pone.0239685.g007

Due to the large number of interrelations between production units in the bearing plant, the closeness score of each production unit needs to be calculated according to Table 5 and Fig 7 , in order to draw a plant layout map. A higher score indicates that the production unit is closer to the center of the layout map. In comparison the production unit with a lower score should be closer to the edge of the layout. Therefore, the plant is re-arranged according to the order of closeness scores which is lathe machining workshop 2 → assembly workshop → drilling operation workshop → heat treatment / gear processing operation workshop → work in process workshop → anti-corrosive workshop → lathe machining workshop 1 → Auxiliary materials workshop →Forging workshop.

In the location relationship diagram of production units, the production units are represented by the numbers marked in ‘○’, and storage units are represented with ‘△’. The interrelationship between production units uses different types of line connections. Nevertheless, the nature of production units is not necessarily strictly distinguished with this method.

For example, the logistics intensity between anti-corrosive workshop (9) and assembly workshop (8) is found to be the strongest (grade A) from Fig 7 , which is represented with three lines connecting the two numbers. The numbers 1–9 are represented the workshops name shows in Fig 7 . By applying this method to all the workshops, Fig 8 is drawn to show the correlations of the production unit locations.

thumbnail

https://doi.org/10.1371/journal.pone.0239685.g008

By combing with the initial layout of the plant, the location correlation diagram ( Fig 8 ) and the actual situation of the plant, the new plant layout ( Fig 9 ) is drawn after the interchanging of assembly workshop, the work in process workshop and the precision lathe processing operation workshop.

thumbnail

https://doi.org/10.1371/journal.pone.0239685.g009

Simulation of bearing plant logistics system based on TdPN.

The above-mentioned TdPN model for the logistics delay of the bearing plant clearly and intuitively described the bearing production process, real-time status, the transition between states, and the logical relationship between processing procedures and resources. However the Petri net could not affect the production system’s efficiency, and resource utilization quantitative evaluation and amelioration. Simultaneously, the SLP method is used to obtain the improvement layout map between the production units in the plant, but whether it has more advantages than the original layout plan needs further verification and analysis. Therefore, the entire plant logistics system is simulated with the simulation software which could solve this problem effectively. Simulation data that are closest to the actual state is analyzed to predict the problems that may exist in the production, propose improvement solutions, and verify the effectiveness of the scheme.

Simulation process design.

A reasonable production logistics modeling and simulation process is designed for bearing plant production logistics system, which includes three important research stages, the preliminary preparation stage, the modeling and simulation stage, and the analysis and optimization stage ( Fig 10 ).

  • The preliminary preparation stage. The work at this stage can be divided into feasibility assessment, problem description and data collection. The feasibility assessment is to evaluate the SLP method of bearing plant layout improvement, Petri net modeling of production logistics system, the simulated problem, and the feasibility of the method. The problem description refers to accurately and comprehensively collecting information on the process of bearing production and the distribution of plant equipment, and analyzing and discovering problems to clarify the tasks of modeling and simulation. Data collection is to collect data on the shift schedule, equipment processing time, production capacity, and area of each workstation in the actual production process.
  • The modeling and simulation stage The main work in this stage includes two steps. The first step is establishment and mathematical analysis of TdPN model which precisely describes the nature of the actual production system based on the bearing production process in the preliminary preparation stage. The second step is establishing and running the FlexSim simulation model which is to map the Petri net model into FlexSim software according to certain rules. By setting parameters and adjusting resources, the FlexSim simulation model is generated. Processes can be found in chapters of ‘Timed Petri net (TdPN) model for bearing workshop logistics system’ and ‘establishment of simulation model’.
  • The analysis and improvement stage. This stage is to analyze the results of the simulation operation of the bearing production system to find the reason of the entire system problem and production imbalance. Based on the problems found, with the integration of the improved plant layout obtained by SLP method, a specific improvement strategy is proposed. Finally, the proposed method and improvement strategy is verified by running the improvement model and analyzing the simulation results (refers to chapters ‘Facilities layout improvement of bearing plant based on systematic layout planning (SLP) method’ and discussion).

thumbnail

https://doi.org/10.1371/journal.pone.0239685.g010

Establishment and running of simulation model.

The FlexSim software can establish an object-oriented visual simulation model which has a interaction and mapping relationship with the Petri net model. In the Petri net model, the plants represent different types of resources corresponding to the entities in FlexSim. When analyzing process logistics, each step is regarded as a processing unit with only inputs and outputs. The changes in the Petri net correspond to the port of the entity in FlexSim. The activity of the Petri net can be used to verify the correctness of the logic of the FlexSim simulation model, to fully restore the actual production system, and to ensure the authenticity of the simulation model. According to the number of plant equipment, the floor plan of the plant layout and the Petri net model combined with the simulation entity type and meaning, a physical simulation model corresponding to the plant production unit is established, and the parameters of each entity are set. The entity type, entity name, and meaning of each production unit are shown in Table 7 . Among them, in order to visually show the physical flow and the unbalance production situation in the bearing plant, temporary storage areas have been added before and after the processing production unit for storing work in progress. The maximum capacity is set to 1000 to avoid the phenomenon that the before and after processes are not connected and unable to work. Finally, in the bearing production process, it is necessary to take the material (inner ring, outer ring, and auxiliary materials) at regular intervals. The raw materials generated by the generator and the time to reach the warehouse to take material are subject to a normal distribution [ 29 ]. The processor provides time setting and flow direction setting functions, which indicate the processing time of different processes in production and assembly. Large-scale wind power bearings are large in volume and can only be carried by forklifts one at a time.

thumbnail

https://doi.org/10.1371/journal.pone.0239685.t007

According to the status of each entity in Table 7 , the production process entities are connected by using the "A" key, while the "S" key is used for forklifts as handling tools. Those two keys indicate the different state transitions and the mutual relationships of the resources. To ensure product quality and reduce the rate of rejects, in actual production, quality inspection is required for each process. A special work area for quality inspectors is set up in the workshop. However, due to the large weight and volume of the product, the quality inspection process is not reflected in the simulation model as it is carried out by the quality inspector to the corresponding station, which does not generate product material flow. The simulation model is established in FlexSim for the initial layout ( Fig 11 ).

thumbnail

https://doi.org/10.1371/journal.pone.0239685.g011

After setting up the FlexSim simulation model of the bearing plant production system, the parameters of the simulation processor are set according to the bearing production process flow, equipment processing time, shift calendar etc. Then, the simulation model is run to achieve visualize production dynamics. To better express the performance of the bearing plant production logistics system, the end state simulation method is used in this paper. With the simulation stop time set to 28800, the simulation report data are retrieved after running the simulation model ( Table 8 ). The simulation results in Table 8 can intuitively express information such as the number of items entering and leaving in different devices, the average time of items staying in the device, the device idle time, the device working time, and the device blocking time.

thumbnail

https://doi.org/10.1371/journal.pone.0239685.t008

Analysis and improvement of simulation results

Result analysis..

This paper mainly studies the bottleneck of the production logistics system of the bearing plant, improving of the equipment layout of the plant. The equipment idle rate and the number of work in process are analyzed according to the characteristics of bearing production.

  • Equipment idle rate Through statistical analyzing of the data with the module in FlexSim software, the proportion of different working states of different equipment in the entire production process can be clearly calculated, to obtain the utilization of different equipment. According to the initial simulation results ( Table 8 ) of the working conditions of the production system, the idle rate of each device can be calculated as equipment idle rate = idle / state_since * 100%. With the moving average method to fit the change trend curve, a scatter plot of the idle rate of each device is drawn ( Fig 12 ). From the Fig 12 , three areas with improvement potential can be identified where the equipment idle rate is significantly higher, namely the drilling operation area (P199, P201, P207, P210, P223, P312), the lathe machining operation area (inner circle) (P195, P197, P224, P243, P322) and precision lathe processing operation areas (P227, P297, P324, P335).
  • Number of works in process production When the number of semi-finished products accumulated in a process is increasing, the equipment of the process is always in working status, and the processing capacity of the equipment is weakling, which will affect the subsequent processes, resulting in the production efficiency and production capacity of the entire production system to decline. However, because the number of works in process is difficult to count by simulation, the analysis is performed with the blockage rate of the equipment. According to the initial simulation results ( Table 8 ) of the working condition of production system, the blocking rate of each device can be calculated as equipment blocking rate = blocked / state_since * 100%, which is shown in Table 9 .

thumbnail

https://doi.org/10.1371/journal.pone.0239685.g012

thumbnail

https://doi.org/10.1371/journal.pone.0239685.t009

It can be concluded from Table 9 that five processors have different degrees of blockage. Among them, three of the processors with significant higher rates of blockage are identified as bottlenecks, which are the processor 345 (20.10%), the processor 9 (65.29%) and processor 10 (75.28%). Through the analysis of the processing flow and time of the bearing production, the processor 345 is in the heat treatment / gear processing operation area, while the processor 9 and processor 10 are in the anti-corrosive area, the subsequent processing time of those two processors is 1440. We find that the main reason for the blockage is varying widely in processing time before and after, which cause an imbalance in the production line. Therefore, to mitigate this time difference, it is recommended to increase the number of equipment in the lathe processing operation area for subsequent processes.

Improvement strategy.

The computer simulation optimization of discrete event dynamic system can overcome the difficulty of solving traditional production system equipment improvement and the limitation of the solution method, and generate results quickly and accurately, by utilizing its built-in data and flow analysis functions. From the analysis of the simulation results in Table 8 , the production system of the bearing plant has an unbalanced equipment utilization, which causes an unbalanced production.

From the chapter of ‘Facilities layout improvement of bearing plant based on systematic layout planning (SLP) method’, we know that the layout of the bearing plant is unreasonable. Therefore, from the above perspective, the existing production system is improved to balance the utilization of different equipment, which in-turn improves the overall production efficiency and achieves the purpose of ameliorating the production system logistics.

We propose two strategies based on above analysis.

  • Increase / decrease the number of equipment According to the analysis the equipment idle rates in the three operating areas of the bearing production system are very high. Therefore, the equipment with idle rate higher than 80% is directly deleted in Table 8 , which includes equipment P199, P201, P207, P210, P223, P312, P195, P197, P224, P243, P322, P227, P297, P324, P335. It not only saves a lot of costs, but also balances the production line. At the same time, according to the analysis of equipment blockage rate, it can be known that the blocking of processor 9 and 10 in the anti-corrosive area is due to the processing time of its subsequent process (processor 11) which is 1440. Therefore, the processor 1 and 2 which are same as processor 11 should be added. Similarly, the blockage of processor 345 in the heat treatment / gear processing operation area are also clogged because of the processing time of a subsequent process which is 1440. Hence, the processor 3 which is same as processor 346 should be added. For the blockage of processor 282, 285 in the lathe processing work area (outer ring), the same processor (processor 4) should be added due to fewer types of equipment.
  • Improve plant layout The plant has experienced the merger and the expansion of production processes and equipment. Due to the unreasonable layout of the production units, the logistics route of the workshop has a roundabout and crossover phenomenon, and the large-scale bearing plant is difficult to move, so a reasonable plant layout is very important. According to the analysis of the SLP method used in this paper, it is known that the layout of the workshop is unreasonable. The improved layout of the plant after the interchange of the assembly area, the work in process warehouse and the precision lathe processing operation area is shown in Fig 9 .

Improved model simulation and result analysis

The two methods proposed in the improvement strategy mainly aim at the three problems, imbalanced utilization of equipment in the production logistics system of the bearing plant, serious accumulation of work in progress (high equipment blocking rate), and unreasonable layout of the plant. This section combines these two improvement strategies to reasonably form a complete improvement scheme and re-establish a simulation model of the bearing plant production system ( Fig 13 ).

thumbnail

https://doi.org/10.1371/journal.pone.0239685.g013

After the establishment of the improved FlexSim simulation model of the bearing plant production logistics system, the parameters of each processing equipment are set. Other simulation conditions such as the shift calendar are unchanged. The end state simulation method is still used. After the simulation runs 28800, a comparative analysis of the equipment idle rate and blockage rate of each processing step after improvement is obtained, as shown in Tables 10 and 11 .

thumbnail

https://doi.org/10.1371/journal.pone.0239685.t010

thumbnail

https://doi.org/10.1371/journal.pone.0239685.t011

According to the data in Table 10 , the high idle processing equipment in the bearing plant production system have been improved and reduced from 17 to only 2. This situation may be caused by the short processing time of the equipment at these stations, the low utilization of the equipment, and the failure to give full play to its original production capacity. Therefore, the imbalance in the production system is caused.

According to the data in Table 11 , it can be seen that the clogging rate of the equipment is reduced by 100%. While there is no clogging of the equipment in the ameliorate production system, it is indicated that the improvement scheme proposed in this paper meet the demand for production capacity, eliminate the blockage of the production line, improve equipment utilization, and make the production system more balanced. Therefore, after the improvement, the blockage of the equipment and the idle rate of the equipment are greatly improved, and the production line is more balanced.

Whether the plant logistics planning of a manufacturing enterprise is reasonable has a great impact on the production efficiency and profitability of an enterprise, and directly affects the quality and cost of the production. Based on the research in this paper, it can be known that the proposed improvement method can solve the problems of unbalanced equipment utilization, bottleneck, unreasonable plant layout, effectiveness of interaction between simulation model and actual production system etc. This study investigates the status of a large wind power bearing production plant, with collection of relevant information and data and its application to the SLP method to re-plan the layout of plant facilities. In addition, in order to find the bottlenecks that restrict the entire plant production logistics system, this paper establishes a bearing manufacturing process model with Petri net method, and verifies the validity of the theoretical model with data such as the number of equipment and processing time in the production process. This modeling method has the advantages of simple and intuitive, easy to understand, and strict mathematical representation. However, it cannot meet the requirements of data types and data quantities required for numerical simulation. Therefore, the advantages of data interface, modular modeling, and dynamic display of statistical performance parameters are provided for the simulation software. It combines Petri net and FlexSim simulation to establish a model mapping relationship between the two. Synthesizing the advantages of Petri net and FlexSim simulation to analyze the production system can better achieve the improvement simulation of the system. Followed by the analysis of problems in blockage and imbalance in the production, and the assembly of the bearing based on the simulation results, suggestions for changing the number of equipment are put forward. With the combined plant layout plan obtained by the SLP method, a complete improvement plan is formed. Subsequently, the production system blockage and production imbalance problem are solved and alleviated by re-simulation and comparative analysis. Moreover, the effectiveness and rationality of the proposed scheme is verified in this paper which provides some reference for the improvement of the plant layout of relevant enterprises. In the future study, researchers should focus on the theoretical minimum process equipment calculation, combining the characteristics of the bearing plant production system, and adopting the method of station reorganization to rationally adjust the process, reduce the number of equipment, and increase the production capacity of the entire production system.

  • View Article
  • Google Scholar
  • 2. He ZC. The Modeling and Simulation of Mechanical Workshop Facilities Layout Based on FlexSim. M.Sc.Thesis. Wuhan University of Technology. 2009. http://cdmd.cnki.com.cn/Article/CDMD-10497-2009106625.htm
  • PubMed/NCBI
  • 20. Petri CA, Kommunikation mit Automaten. PhD. Thesis, Institut für Instrumentelle Mathematik. 1962. http://edoc.sub.uni-hamburg.de/informatik/volltexte/2011/160/
  • 21. Cao JF. Research on Production Logistics System Simulation Based on Petri Net. M.Sc. Thesis. Harbin Institution of Technology. 2011. http://cdmd.cnki.com.cn/Article/CDMD-10213-1012000574.htm
  • 27. Mu G, Li QL, Meng QJ. System Modeling. 2 nd Ed. Beijing: National Defense Industry Press; 2013.
  • 28. Ramchandani C. Analysis of Asynchronous Concurrent Systems by Timed Petri Nets. PhD. Thesis. Massachusetts Institute of Technology. 1974.
  • 29. Pei BH. Workshop Facility Layout and Optimization of Production Logistics System Simulation in H Company. M.Sc. Thesis. Guangxi University. 2015. https://cdmd.cnki.com.cn/Article/CDMD-10593-1016218539.htm

U.S. flag

An official website of the United States government

The .gov means it’s official. Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you’re on a federal government site.

The site is secure. The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

  • Publications
  • Account settings
  • Advanced Search
  • Journal List

Logo of plosone

A study of the layout planning of plant facility based on the timed Petri net and systematic layout planning

1 School of Economics and Management, Dalian University of Technology, Dalian, Liaoning, China

Xiaobing Liu

2 CRRC Dalian R&D Co., Ltd., Dalian, Liaoning, China

Sardar M. N. Islam

3 Institute for Sustainable Industries & Liveable Cities, Victoria University, Melbourne, Australia

Associated Data

All relevant data are within the paper. Also, the information of the bearings are available from the protocols.io database (DOI: dx.doi.org/10.17504/protocols.io.bk2akyae ).

The purpose of this research is to solve the problems of unreasonable layout of the production plant, disorder of the logistics process, and unbalanced production line in discrete manufacturing plants. By analyzing the production process and characteristics, the timed Petri net model is constructed according to the function and connection of each production unit, which is then used to generate a FlexSim simulation model of the production plant logistics system with a simulation software. Therewith the FlexSim simulation model is used to simulate the original layout of the plant, and to analyse the simulation data synthetically to put forward an improvement strategy. Combined with the use of the systematic layout planning method to analyze the overall layout of the plant and logistics relations, we infer the relevant drawings between the production units and determine the improved layout of the facilities. Finally, by comparing the before and after improvement simulation results, it is verified that the combination of timed Petri nets and systematic layout planning is effective to ameliorate the layout of the plant facilities and the logistics system. This method makes up for the factors that traditional methods have not considered, achieves the goal of reducing the cross circuitous route of the plant and the idle rate of equipment, and improving the efficiency of production.

Introduction

With the increasing degree of automation in China’s discrete manufacturing industry, the potential for improving the efficiency of processing procedures to reduce costs has been consequently narrowing. As the result the key to enterprise competition has gradually shifted to new areas, such as logistics technologies that is closely related to production [ 1 ]. Facility planning, as an important part of the improvement of the production logistics system, refers to meeting the necessary constraints in a certain production environment, and determining the reasonable layout form and location of the equipment according to the production goals [ 2 ]. For some large-scale equipment products, the transfer time between processes is long and the transfer costs are high. Wang and He shows a reasonable layout of the plant facilities can effectively improve the turnover rate of work in progress and parts, shorten the production cycle, and reduce the transfer cost by approximately 30% [ 3 ]. It has been widely used in manufacturing, medicine, education, and other fields since being proposed by Richard Muther in 1961. The systematic layout planning (SLP) method calculates the logistics between the production units on the basis of analyzing the five basic elements that affect the effectiveness of the system: P (product), Q (output), R (process flow), S (auxiliary department), and T (time). Naqvi et al. use the improved SLP to develop a new layout which reorganizes the production departments of multinational companies that produce diversified products to improve production efficiency [ 4 ]. Kumar et al. propose a Data Envelopment Analysis (DEA) Charnes Cooper & Rhodes (CCR) model with constant returns to scale (CRS) to implement the Lean-Kaizen method. This method is considered an effective method to improve the quality system in the fastener industry and contributes to industrial lean [ 5 ]. Liu et al. propose an alarm window layout method suitable for the diagnosis process. By using the SLP method to improve the human-system interface problem, the safety digital alarm window of nuclear power plant is designed [ 6 ]. Benitez et al. use cluster analysis combined with SLP to plan the report area of the radiology department, using medical experts as a clustering variable to re-plan department to improve the performance of the radiology department [ 7 ]. Tarigan et al. propose a ranked positional weight method combined with SLP to modify the production line of wood production and the handling track of material movement [ 8 ].

However, the traditional SLP method may be affected by the subjective experience and knowledge limitation when drawing the correlation diagram of the position of the operating unit. Therefore, the final layout design scheme cannot verify its scientificity and rationality. With the development of computer technology, an increasing number of studies have used SLP and simulation software, such as Flexsim [ 9 – 12 ], Witness [ 13 ], and Quest [ 1 ], to conduct research objects optimization, improvement and case verification. The use of computer technology to help generate new layouts has been valued by scholars. In order to predict the maximum energy of photovoltaic modules more accurately, Stojčić et al. establish a model based on the principles of the fuzzy logic and artificial neural networks and integrate it into the Adaptive Neuro Fuzzy Inference System (ANFIS). Using PVsyst software for sensitivity analysis, they have obtained better prediction results than mathematical models [ 14 ]. Sremac et al. propose that based on the input and output data of the research object, a hybrid method of artificial intelligence ANFIS is used to establish a model for the decision of economic order quantity. Then use simulation to conduct sensitivity analysis to verify the effectiveness of the model for different types of goods in the supply chain management [ 15 ]. Korde and Sahu conclude that with the assist of the SLP method, the layout of the manufacturing automotive parts plant is organized and analyzed. The results can be verified by using simulation to derive a new layout [ 16 ]. Deshpande et al. use Computerized Relative Allocation of Facilities technology (CRAFT) to improve the layout of manufacturing plants. It is proposed the use of Automated Layout Design Program (ALDEP) to reduce costs [ 17 ]. Sharafati et al. propose a hybrid ANFIS as a predictive model. Then the error index is used to run the simulation model to estimate the scouring depth downstream of the sluice gate to manage the irrigation system [ 18 ]. Suhardini et al. simulate material handling cost and processing time of Material Handling Evaluation Sheet (MHES) to obtain new planning layout evaluation and program selection, which reduced the material handling cost of building material manufacturers [ 19 ]. Simulation technology can simulate the actual operation of a logistics system and test the performance of the system with given. It can generate simulation reports including status characteristics (idle, blockage, etc.), the number of inputs and outputs, and the maximum waiting time to identify bottleneck processes and resources, and facilitate the selection of layout schemes and the verification of effects.

In recent years, there have been some methods describing the modeling of production logistics systems. Among them, the Petri net is proposed by Dr. Petri in 1962 has the characteristics of simple, easy-to-understand graphics, and strict and accurate mathematical functions [ 20 ]. It has clear advantages in describing the concurrency, conflict, resource sharing, and other uncertain situations of complex and dynamic discrete production systems [ 21 ]. Guo et al. propose an adaptive collaborative timed colored Petri net model of the production logistics system in the internet environment and demonstrated that the method is superior to the events-driving method [ 22 ]. Considering the movement path of the robot between base stations, Al-Ahmari et al. propose the use of time-delay petri net (TdPN) to optimize the robot motion controller in the robot scheduling problem, and demonstrated the effectiveness through a mathematical model [ 23 ]. Yianni et al. use Petri net to build model to inspect different modules. Based on the model, establish a powerful framework for managing railway bridge asset portfolios [ 24 ]. Uzam et al. propose a think-globally-act-locally method with weighted arcs (TGALW) for calculating liveness-enforcing weighted arcs in the general Petri net model, which is used to monitor the activity in the flexible manufacturing system [ 25 ]. Mejía et al. establish a combination model of colored and ordinary petri net to solve the integration and collaborative project management in the animation and video game (A&V) industries through the Graph Search algorithm [ 26 ].

Many international scholars have studied the setting layout optimization based on the SLP method and the modeling of production logistics system based on the Petri net theory, which have applied the simulation software to specific practical cases to solve the problem of facility planning. However, as the research continues to deepen, the issues involved become more complex. In the literature that has been consulted, it is found that these two parts are relatively isolated. This study uses a large-scale world-class wind power bearing manufacturing plant as the research object. Starts from three research aspects of modeling, improvement, and simulation. Firstly, the bearing production process model and logistics timed delay Petri net (TdPN) model are established through the analyses of the production process and logistics process of the research object. The validity of the dynamic behavior of the logistics system is verified by a mathematical model constructed on Petri net. Secondly, the SLP method is used to analyze the logistics intensity between each operation unit to obtain the improved layout. At last, a FlexSim visual simulation model is constructed. Based on the verification results of the Petri net, and under the premise of ensuring the validity of the simulation model, each processing procedure and equipment usage in the original layout and the new layout obtained by the SLP method are simulated and analyzed to determine if a bottleneck in production is an issue. In addition, improvement measures and opinions are proposed to make the plant logistics smoother and maximize the value of the plant logistics system.

Situation and problem description

The research subject is Wafangdian Bearing Company Limited which is a large-scale wind power manufacturing company located in Dalian, Liaoning, China. Data is collected without special permit. It encompassed an area of 14,592 square meters, of which the plant area was 76 meters long from north to south and 192 meters wide from east to west. There are nearly 500 managers and workers at all levels of the factory, working in three shifts. The company currently has 30 different types of products in progress for rotating pivot bearing of large-scale wind power turbine, such as spindle bearing, yaw bearing, pitch bearing, speed increaser bearing, drive reducer bearing and generator bearing, etc. With an annual production capacity of about 15,000 sets. The company’s current annual order is about 8,000 sets, with a capacity utilization rate of only 53%. One-third of the equipment has been idle for a long time, but the workshop space has been saturated, and excess equipment has caused detours in the workshop. The investigation find that in the initial stage of the factory establishment, only the bearing inner and outer ring processing production, assembly and anti-corrosion processes are carried out in other plants. After the company’s merger planning, the factory needs to complete all the processes from forging to machining, heat treatment, assembly, and anti-corrosion, among others. The production of parts and components directly affect the later assembly process. It is a typical production workshop with a mix of machining and assembly processes. The merger of the factories makes the layout of the production units very unreasonable, the logistics routes of the workshops are not smooth, and many long-distance handling activities are required. Also, unsatisfactory production rhythms and uneven production lines increase the flow of materials and logistics costs in the plant. The area of each production unit and the number of pieces of equipment are shown in Table 1 .

Based on the data collected from the plant and Table 1 , the original layout of the plant is shown in Fig 1 .

An external file that holds a picture, illustration, etc.
Object name is pone.0239685.g001.jpg

Facing the fiercely competitive market, the company adopts the one-piece production model, which meets customer needs and strengthen the quality traceability. However, it is not enough to win market orders based on high quality to change the company’s status quo, reasonably arrange plant facilities, and improve equipment utilization rate. Reducing workshop logistics costs and achieving lean production management of enterprises are necessary means as well.

For review this paper, the rest structure organization as follows. The bearing production process is analyzed to establish the TdPN model for the plant logistics system. After that, an improved layout of the plant is proposed based on SLP. Afterwards, a simulation model of the original layout is established by the TdPN model and FlexSim software interaction, then the improvement strategies are proposed. Lastly, combined the improved layout with proposed strategies, the improvement simulation model is established to verify the effective. A roadmap of the overall framework, analysis methods and models gives in Fig 2 .

An external file that holds a picture, illustration, etc.
Object name is pone.0239685.g002.jpg

Modeling of plant production process and logistics TdPN model

The plant production system is a typical discrete event system that triggers the occurrence of events with events. Petri net is a network system model used to describe the combination of physical processes and systems which is an effective tool for discrete time modeling. It describes not only the structure, but also the dynamic behavior of the system. Methods hierarchical description and analysis of the properties of complex discrete systems are performed, and refinement is gradually achieved [ 27 ]. The basis of the bearing production TdPN model is the production process model. Taking spindle bearing as an example, the production process is analyzed and improved to lay the foundation for the next modeling and simulation.

Analysis of bearing production process

Large-scale wind power bearings are mainly composed of four main parts which are inner ring, outer ring, rolling body and cage, and other auxiliary parts, such as seals, dust covers, and rivets. Bearing production mainly includes the two processes of inner and outer ring processing and fitting assembly. The inner and outer ring forgings are respectively processed through lathe machining, heat treatment/gear processing, drilling, and other testing auxiliary processing to form semi-finished products of the inner and outer rings. The semi-finished products of the inner and outer rings that have undergone grinding and other processing techniques must be cleaned and dried before final assembly. The following steps are sorting into sets, installing rolling elements, protective rubber ropes, seals, screws, and so on. After that, sandblast and spray-paint for corrosion protection and drying processes are followed. Finally complete removal the semi-finished seals, installation the seals, mounting screws, grease and other assembly and packaging processes to form the finished bearing products, which stores in the finished product warehouse. In actual production, the process as the basis for the standard process of production and plan scheduling is very detailed. For example, lathe machining includes ordinary lathe machining (lathe machining 1) and precision lathe machining (lathe machining 2). The main processes are shown in Table 1 . To facilitate the study, the modular modeling of its process according to the processing flow is shown in Fig 3 .

An external file that holds a picture, illustration, etc.
Object name is pone.0239685.g003.jpg

Timed Petri net (TdPN) model for bearing plant logistics system

TdPN definition . TdPN is first proposed by Ramchandani to analyze the performance of asynchronous concurrent systems [ 28 ]. TdPN is a 5-tuple ∑ = ( S , T ; F , M , DI ), where ( S , T ; F , M ) is a prototype Petri net. S = { S 1 , S 2 , ⋯, S n } is a set of finite place of ∑, T = { T 1 , T 2 , ⋯, T n } is a set of finite transitions of ∑; F is an ordered pair set consisting of an S element and a T element in ∑, which is called the flow Relation of ∑ Relation; M : S → {0, 1, 2, ⋯} is called a ∑ mark, the mark M 0 ( s ) represents the distribution of tokens in the warehouse in the initial state. R ( M 0 ) represents the set of all of the states that may occur during the system operation, and DI is the definition time function on transition set T , that is, DI: T → R 0 . When a TdPN is represented graphically, S n is drawn as a small circle, T n is drawn as a small rectangle, F is drawn as a directed edge and exists only between the small circle and the small rectangle, and M ( s ) is represented by a black dot in S n . The drawing of this description can refer to Fig 5 . For t ∈ T , DI( t ) = a means that the occurrence of transition t requires a unit time to complete. That is, when a mark M satisfies M [ t >, the transition t can occur immediately, but the occurrence of t ends only after a time units has elapsed. The above definition of TdPN violates the transient principle of transition. Therefore, in TdPN, for each non-transient transition can be replaced by a sub-net composed of two transient transitions and a time-valued place ( Fig 4 ).

An external file that holds a picture, illustration, etc.
Object name is pone.0239685.g004.jpg

TdPN model . The production, processing, and assembly of bearings can be divided into several processes. According to the connection relationship between the processes and the duration of each process, combined with the basic principles of Petri net, a TdPN model of the bearing production process is constructed. The connection of three plants and two transitions represent that the work-piece completes one process and is ready to enter the next process ( Fig 5 ), where t i 1 represents the start of process i , t i 2 represents the completion of process i , and place s i means that process i is processing, and assigns a time value a i to storehouse s i , which means that from t i 1 , at least a i time unit must elapse before t i 2 can occur. s i 1 means that the workpiece is ready for processing, and s i 2 means equipment for processing s i it is usable or not.

According to the analysis of the bearing production process outlined above, a TdPN model is established for the production logistics system of the bearing plant. The establishment of the TdPN has been a guiding role for logistics analysis, plant construction, facility layout, and actual production. Fig 6 is a TdPN model of the logistics system for the processing and assembly of the inner and outer rings of a bearing plant. This logistics system model is composed of an inner circle production line, an outer circle production line, and packaged wiring.

An external file that holds a picture, illustration, etc.
Object name is pone.0239685.g006.jpg

The meanings of the symbols ( S , T ) in Fig 6 explain in Tables ​ Tables2 2 and ​ and3 3 which are the product processing time, waiting for status and equipment status ( Table 2 ), and the product processing status ( Table 3 ).

Due to resource shortage or congestion, system operation may be stopped, that is, no changes can be started; such a net is not liveness. Let ∑ = ( S , T ; F , M , DI ) be a delayed Petri net. If M ∈ R ( M 0 ) makes ∀t ∈ T : ¬ M [ t >, then M is called a dead marking of ∑. If there is no dead mark in ∑, then ∑ is called non-dead. In Fig 6 , the M = { S 1 , S 2 , ⋯, S 63 } T is identified, where S 1 , S 26 , S 51 is the input places and S 63 is the output place. The specific situation of the bearing plant is analyzed to obtain the initial mark M 0 = {1,1,0,0,0,1,⋯,1,1,0,0,0,1,⋯,1,0,0,1,0} T of the Petri net. According to the Petri net change rules, T 1 is changed under the initial mark, T 17 has the right to occur. If T 17 occurs, the status of the new system can be determined, that is, the new logo M 1 = {0,0,1,0,0,1,⋯,0,0,1,0,0,1,⋯,1,0,0,1,0} T . After 120 minutes, the inner ring forging precision lathe machining is completed, T 18 has the right to generate, M 2 = {0,0,1,0,0,1,⋯,0,0,0,1,0,1,⋯,1,0,0,1,0} T , at this time T 19 has the right to occur. The inner ring drilling is finished after 110 minutes, at this time the outer ring is still undergoing precision lathe machining of forgings. By analogy, the transition set is excited in turn, and M 40 = {0,1,0,0,0,1,⋯,0,1,0,0,0,1,⋯,1,0,0,1,1} T is obtained. According to the above analysis, both ∀ M ∈ R ( M 0 ) and ∃ M ’ ∈ R ( M ) in the model make M ‘[ t >, so the model is reachable, active, and bounded, which is convenient for simulation.

Bearing plant facility layout and simulation

Facilities layout optimization of bearing plant based on systematic layout planning (slp) method.

The SLP method obtains the logistics flow chart of the plant production system by analyzing the logistics process of the manufacturing process. Analyzing the problems in the layout of the plant facilities by using F-D (flow-distance) afterwards, and drawing a correlation diagram of the location of the production unit according to the logistics relationship to improve the plant logistics system. The closeness of logistics intensity between production units is calculated and the degree of precision is analyzed based on the floor plan of a large-scale wind power bearing manufacturer in Fig 1 , the distance between production units (approximately the location of each area at the center point), the scale of production (600 monthly production), and the production process ( Fig 3 ).

Assuming that the bearing production system has n production units, and the material flow matrix from point i to point j of every two production units is Q = [ q ij ] n × n . When i to j has no material flow relationship, that is, q ij = 0, calculate the distance matrix D = [ d ij ] n × n according to Fig 1 , then the minimum logistics intensity of the entire system is F = m i n ∑ i = 1 n ∑ j = 1 n q i j d i j . According to the collected data and the above formula, a summary table of the bearing plant logistics intensity is calculated ( Table 4 ).

Because there are a lot of logistics data in large bearing plant, five grades are introduced in the SLP method to describe the logistics intensity ( Table 5 ). When analyzing the logistics intensity, the movement sequence and movement volume of the logistics objects are determined, followed by taking the movement volume of the logistics objects within a certain period as the logistics intensity.

The five levels of intensity are A (absolutely important), E (extremely important), I (Important), O (ordinary important), U (unimportant). Table 5 indicates that the more lines, the stronger the logistics intensity.

According to the classification criteria and the logistics intensity in Table 4 , the logistics intensity levels of each production unit can be analyzed which is shown in Table 6 . Each pair of units in Table 6 is calculated based on the data in Table 4 .

Based on the vertical order of the workshops listed in Table 4 , the logistics intensity grade for each production unit is determined and presented in Table 6 . Hence, the correlations of the production units are classified in Fig 7 .

An external file that holds a picture, illustration, etc.
Object name is pone.0239685.g007.jpg

Due to the large number of interrelations between production units in the bearing plant, the closeness score of each production unit needs to be calculated according to Table 5 and Fig 7 , in order to draw a plant layout map. A higher score indicates that the production unit is closer to the center of the layout map. In comparison the production unit with a lower score should be closer to the edge of the layout. Therefore, the plant is re-arranged according to the order of closeness scores which is lathe machining workshop 2 → assembly workshop → drilling operation workshop → heat treatment / gear processing operation workshop → work in process workshop → anti-corrosive workshop → lathe machining workshop 1 → Auxiliary materials workshop →Forging workshop.

In the location relationship diagram of production units, the production units are represented by the numbers marked in ‘○’, and storage units are represented with ‘△’. The interrelationship between production units uses different types of line connections. Nevertheless, the nature of production units is not necessarily strictly distinguished with this method.

For example, the logistics intensity between anti-corrosive workshop (9) and assembly workshop (8) is found to be the strongest (grade A) from Fig 7 , which is represented with three lines connecting the two numbers. The numbers 1–9 are represented the workshops name shows in Fig 7 . By applying this method to all the workshops, Fig 8 is drawn to show the correlations of the production unit locations.

An external file that holds a picture, illustration, etc.
Object name is pone.0239685.g008.jpg

By combing with the initial layout of the plant, the location correlation diagram ( Fig 8 ) and the actual situation of the plant, the new plant layout ( Fig 9 ) is drawn after the interchanging of assembly workshop, the work in process workshop and the precision lathe processing operation workshop.

An external file that holds a picture, illustration, etc.
Object name is pone.0239685.g009.jpg

Simulation of bearing plant logistics system based on TdPN

The above-mentioned TdPN model for the logistics delay of the bearing plant clearly and intuitively described the bearing production process, real-time status, the transition between states, and the logical relationship between processing procedures and resources. However the Petri net could not affect the production system’s efficiency, and resource utilization quantitative evaluation and amelioration. Simultaneously, the SLP method is used to obtain the improvement layout map between the production units in the plant, but whether it has more advantages than the original layout plan needs further verification and analysis. Therefore, the entire plant logistics system is simulated with the simulation software which could solve this problem effectively. Simulation data that are closest to the actual state is analyzed to predict the problems that may exist in the production, propose improvement solutions, and verify the effectiveness of the scheme.

Simulation process design

A reasonable production logistics modeling and simulation process is designed for bearing plant production logistics system, which includes three important research stages, the preliminary preparation stage, the modeling and simulation stage, and the analysis and optimization stage ( Fig 10 ).

An external file that holds a picture, illustration, etc.
Object name is pone.0239685.g010.jpg

The work at this stage can be divided into feasibility assessment, problem description and data collection. The feasibility assessment is to evaluate the SLP method of bearing plant layout improvement, Petri net modeling of production logistics system, the simulated problem, and the feasibility of the method. The problem description refers to accurately and comprehensively collecting information on the process of bearing production and the distribution of plant equipment, and analyzing and discovering problems to clarify the tasks of modeling and simulation. Data collection is to collect data on the shift schedule, equipment processing time, production capacity, and area of each workstation in the actual production process.

The main work in this stage includes two steps. The first step is establishment and mathematical analysis of TdPN model which precisely describes the nature of the actual production system based on the bearing production process in the preliminary preparation stage. The second step is establishing and running the FlexSim simulation model which is to map the Petri net model into FlexSim software according to certain rules. By setting parameters and adjusting resources, the FlexSim simulation model is generated. Processes can be found in chapters of ‘Timed Petri net (TdPN) model for bearing workshop logistics system’ and ‘establishment of simulation model’.

This stage is to analyze the results of the simulation operation of the bearing production system to find the reason of the entire system problem and production imbalance. Based on the problems found, with the integration of the improved plant layout obtained by SLP method, a specific improvement strategy is proposed. Finally, the proposed method and improvement strategy is verified by running the improvement model and analyzing the simulation results (refers to chapters ‘Facilities layout improvement of bearing plant based on systematic layout planning (SLP) method’ and discussion).

Establishment and running of simulation model

The FlexSim software can establish an object-oriented visual simulation model which has a interaction and mapping relationship with the Petri net model. In the Petri net model, the plants represent different types of resources corresponding to the entities in FlexSim. When analyzing process logistics, each step is regarded as a processing unit with only inputs and outputs. The changes in the Petri net correspond to the port of the entity in FlexSim. The activity of the Petri net can be used to verify the correctness of the logic of the FlexSim simulation model, to fully restore the actual production system, and to ensure the authenticity of the simulation model. According to the number of plant equipment, the floor plan of the plant layout and the Petri net model combined with the simulation entity type and meaning, a physical simulation model corresponding to the plant production unit is established, and the parameters of each entity are set. The entity type, entity name, and meaning of each production unit are shown in Table 7 . Among them, in order to visually show the physical flow and the unbalance production situation in the bearing plant, temporary storage areas have been added before and after the processing production unit for storing work in progress. The maximum capacity is set to 1000 to avoid the phenomenon that the before and after processes are not connected and unable to work. Finally, in the bearing production process, it is necessary to take the material (inner ring, outer ring, and auxiliary materials) at regular intervals. The raw materials generated by the generator and the time to reach the warehouse to take material are subject to a normal distribution [ 29 ]. The processor provides time setting and flow direction setting functions, which indicate the processing time of different processes in production and assembly. Large-scale wind power bearings are large in volume and can only be carried by forklifts one at a time.

According to the status of each entity in Table 7 , the production process entities are connected by using the "A" key, while the "S" key is used for forklifts as handling tools. Those two keys indicate the different state transitions and the mutual relationships of the resources. To ensure product quality and reduce the rate of rejects, in actual production, quality inspection is required for each process. A special work area for quality inspectors is set up in the workshop. However, due to the large weight and volume of the product, the quality inspection process is not reflected in the simulation model as it is carried out by the quality inspector to the corresponding station, which does not generate product material flow. The simulation model is established in FlexSim for the initial layout ( Fig 11 ).

An external file that holds a picture, illustration, etc.
Object name is pone.0239685.g011.jpg

After setting up the FlexSim simulation model of the bearing plant production system, the parameters of the simulation processor are set according to the bearing production process flow, equipment processing time, shift calendar etc. Then, the simulation model is run to achieve visualize production dynamics. To better express the performance of the bearing plant production logistics system, the end state simulation method is used in this paper. With the simulation stop time set to 28800, the simulation report data are retrieved after running the simulation model ( Table 8 ). The simulation results in Table 8 can intuitively express information such as the number of items entering and leaving in different devices, the average time of items staying in the device, the device idle time, the device working time, and the device blocking time.

Analysis and improvement of simulation results

Result analysis.

This paper mainly studies the bottleneck of the production logistics system of the bearing plant, improving of the equipment layout of the plant. The equipment idle rate and the number of work in process are analyzed according to the characteristics of bearing production.

Through statistical analyzing of the data with the module in FlexSim software, the proportion of different working states of different equipment in the entire production process can be clearly calculated, to obtain the utilization of different equipment. According to the initial simulation results ( Table 8 ) of the working conditions of the production system, the idle rate of each device can be calculated as equipment idle rate = idle / state_since * 100%. With the moving average method to fit the change trend curve, a scatter plot of the idle rate of each device is drawn ( Fig 12 ).

An external file that holds a picture, illustration, etc.
Object name is pone.0239685.g012.jpg

From the Fig 12 , three areas with improvement potential can be identified where the equipment idle rate is significantly higher, namely the drilling operation area (P199, P201, P207, P210, P223, P312), the lathe machining operation area (inner circle) (P195, P197, P224, P243, P322) and precision lathe processing operation areas (P227, P297, P324, P335).

When the number of semi-finished products accumulated in a process is increasing, the equipment of the process is always in working status, and the processing capacity of the equipment is weakling, which will affect the subsequent processes, resulting in the production efficiency and production capacity of the entire production system to decline. However, because the number of works in process is difficult to count by simulation, the analysis is performed with the blockage rate of the equipment.

According to the initial simulation results ( Table 8 ) of the working condition of production system, the blocking rate of each device can be calculated as equipment blocking rate = blocked / state_since * 100%, which is shown in Table 9 .

It can be concluded from Table 9 that five processors have different degrees of blockage. Among them, three of the processors with significant higher rates of blockage are identified as bottlenecks, which are the processor 345 (20.10%), the processor 9 (65.29%) and processor 10 (75.28%). Through the analysis of the processing flow and time of the bearing production, the processor 345 is in the heat treatment / gear processing operation area, while the processor 9 and processor 10 are in the anti-corrosive area, the subsequent processing time of those two processors is 1440. We find that the main reason for the blockage is varying widely in processing time before and after, which cause an imbalance in the production line. Therefore, to mitigate this time difference, it is recommended to increase the number of equipment in the lathe processing operation area for subsequent processes.

Improvement strategy

The computer simulation optimization of discrete event dynamic system can overcome the difficulty of solving traditional production system equipment improvement and the limitation of the solution method, and generate results quickly and accurately, by utilizing its built-in data and flow analysis functions. From the analysis of the simulation results in Table 8 , the production system of the bearing plant has an unbalanced equipment utilization, which causes an unbalanced production.

From the chapter of ‘Facilities layout improvement of bearing plant based on systematic layout planning (SLP) method’, we know that the layout of the bearing plant is unreasonable. Therefore, from the above perspective, the existing production system is improved to balance the utilization of different equipment, which in-turn improves the overall production efficiency and achieves the purpose of ameliorating the production system logistics.

We propose two strategies based on above analysis.

According to the analysis the equipment idle rates in the three operating areas of the bearing production system are very high. Therefore, the equipment with idle rate higher than 80% is directly deleted in Table 8 , which includes equipment P199, P201, P207, P210, P223, P312, P195, P197, P224, P243, P322, P227, P297, P324, P335. It not only saves a lot of costs, but also balances the production line. At the same time, according to the analysis of equipment blockage rate, it can be known that the blocking of processor 9 and 10 in the anti-corrosive area is due to the processing time of its subsequent process (processor 11) which is 1440. Therefore, the processor 1 and 2 which are same as processor 11 should be added. Similarly, the blockage of processor 345 in the heat treatment / gear processing operation area are also clogged because of the processing time of a subsequent process which is 1440. Hence, the processor 3 which is same as processor 346 should be added. For the blockage of processor 282, 285 in the lathe processing work area (outer ring), the same processor (processor 4) should be added due to fewer types of equipment.

The plant has experienced the merger and the expansion of production processes and equipment. Due to the unreasonable layout of the production units, the logistics route of the workshop has a roundabout and crossover phenomenon, and the large-scale bearing plant is difficult to move, so a reasonable plant layout is very important. According to the analysis of the SLP method used in this paper, it is known that the layout of the workshop is unreasonable. The improved layout of the plant after the interchange of the assembly area, the work in process warehouse and the precision lathe processing operation area is shown in Fig 9 .

Improved model simulation and result analysis

The two methods proposed in the improvement strategy mainly aim at the three problems, imbalanced utilization of equipment in the production logistics system of the bearing plant, serious accumulation of work in progress (high equipment blocking rate), and unreasonable layout of the plant. This section combines these two improvement strategies to reasonably form a complete improvement scheme and re-establish a simulation model of the bearing plant production system ( Fig 13 ).

An external file that holds a picture, illustration, etc.
Object name is pone.0239685.g013.jpg

After the establishment of the improved FlexSim simulation model of the bearing plant production logistics system, the parameters of each processing equipment are set. Other simulation conditions such as the shift calendar are unchanged. The end state simulation method is still used. After the simulation runs 28800, a comparative analysis of the equipment idle rate and blockage rate of each processing step after improvement is obtained, as shown in Tables ​ Tables10 10 and ​ and11 11 .

According to the data in Table 10 , the high idle processing equipment in the bearing plant production system have been improved and reduced from 17 to only 2. This situation may be caused by the short processing time of the equipment at these stations, the low utilization of the equipment, and the failure to give full play to its original production capacity. Therefore, the imbalance in the production system is caused.

According to the data in Table 11 , it can be seen that the clogging rate of the equipment is reduced by 100%. While there is no clogging of the equipment in the ameliorate production system, it is indicated that the improvement scheme proposed in this paper meet the demand for production capacity, eliminate the blockage of the production line, improve equipment utilization, and make the production system more balanced. Therefore, after the improvement, the blockage of the equipment and the idle rate of the equipment are greatly improved, and the production line is more balanced.

Whether the plant logistics planning of a manufacturing enterprise is reasonable has a great impact on the production efficiency and profitability of an enterprise, and directly affects the quality and cost of the production. Based on the research in this paper, it can be known that the proposed improvement method can solve the problems of unbalanced equipment utilization, bottleneck, unreasonable plant layout, effectiveness of interaction between simulation model and actual production system etc. This study investigates the status of a large wind power bearing production plant, with collection of relevant information and data and its application to the SLP method to re-plan the layout of plant facilities. In addition, in order to find the bottlenecks that restrict the entire plant production logistics system, this paper establishes a bearing manufacturing process model with Petri net method, and verifies the validity of the theoretical model with data such as the number of equipment and processing time in the production process. This modeling method has the advantages of simple and intuitive, easy to understand, and strict mathematical representation. However, it cannot meet the requirements of data types and data quantities required for numerical simulation. Therefore, the advantages of data interface, modular modeling, and dynamic display of statistical performance parameters are provided for the simulation software. It combines Petri net and FlexSim simulation to establish a model mapping relationship between the two. Synthesizing the advantages of Petri net and FlexSim simulation to analyze the production system can better achieve the improvement simulation of the system. Followed by the analysis of problems in blockage and imbalance in the production, and the assembly of the bearing based on the simulation results, suggestions for changing the number of equipment are put forward. With the combined plant layout plan obtained by the SLP method, a complete improvement plan is formed. Subsequently, the production system blockage and production imbalance problem are solved and alleviated by re-simulation and comparative analysis. Moreover, the effectiveness and rationality of the proposed scheme is verified in this paper which provides some reference for the improvement of the plant layout of relevant enterprises. In the future study, researchers should focus on the theoretical minimum process equipment calculation, combining the characteristics of the bearing plant production system, and adopting the method of station reorganization to rationally adjust the process, reduce the number of equipment, and increase the production capacity of the entire production system.

Funding Statement

The CRRC Dalian R&D Co. Ltd. support in the form of salaries for author [Lin LIN], but did not have any additional role in the study design, data collection and analysis, decision to publish, or preparation of the manuscript. The specific roles of this author are articulated in the ‘author contributions’ section.

Data Availability

Academia.edu no longer supports Internet Explorer.

To browse Academia.edu and the wider internet faster and more securely, please take a few seconds to  upgrade your browser .

Enter the email address you signed up with and we'll email you a reset link.

  • We're Hiring!
  • Help Center

paper cover thumbnail

A CASE STUDY ON IMPROVEMENT OF PLANT LAYOUT FOR EFFECTIVE PRODUCTION

Profile image of TJPRC Publication

This study aims to improve the existing plant layout for Tushar Engineering and Works, Nagpur. The final solution for a plant layout has designed to balance among the characteristics and considerations of all factors, affecting plant layout in order to get the maximum advantages.

Related Papers

achal shahare

The objective of this research paper is to present an overview on a new combined methodology for the efficient improvement in productivity with the help of various tools, techniques and principles. Work study is one of the most influential & effective methodologies for eliminating obstructions in plant layout, machinery and flow process and thus obtain maximum productivity. The existing plant layout and the operation process of each department (i.e. Reception dock, processing area, storage area, production area, packaging area and utilities etc.) have been observed and investigate w.r.t plant layout, material flow of each section is identified. Using the improved methods the suitable new proposed plant layout can decrease the distance of material flow

plant layout research paper

yenny purwa

IAEME Publication

Facility layout design involves a systematic physical arrangement of different departments, work stations, machines, equipments, storage areas and common areas in a manufacturing industry. In today's competitive global environment, the optimum facility layout has become an effective tool in cost reduction by enhancing the productivity. It has become very essential to have a well organised plant layout for all available resources in an optimum manner to achieve the maximum returns from the capacity of facilities. To achieve the optimisation objectives a lot of techniques are developed by many researchers in the domain area. The objective of this paper is to review the contributions in the field not only for plant layout but re-layout also.

Editor IJRET

International Journal of Scientific Research in Science, Engineering and Technology

International Journal of Scientific Research in Science, Engineering and Technology IJSRSET

This paper proposes an efficient and flexible research methodology for selection of plant layout for optimum utilization of resources and deal with future change. It consists of two steps, one for generating the layout alterative and other for selecting the optimum layout, generation of layout with the help of SLP (Systematic Layout Planning) and selection of optimum layout by using MCDM tools and technique by considering weight of each criteria. this research framework consists of define the problem, data collection, generation of alternative, selection of criteria & criteria score, MCDM tools & technique and selection & maintain. this methodology allows flexibility to be incorporated into the design of a new plant layout or provide improvement in exiting one.

International Journal of Advances in Scientific Research and Engineering (ijasre)

Editor Ijasre

In a global market the manufacturing industries have to minimized the production cost and improve the efficiency. The effective design of plant layout can significantly minimized the operational costs of manufacturing companies. An adequate plant layout design can improve the performance of the production line, their flexibility, efficiency. Proper plant layout design is one of the keys of success in factory management. In this study ongoing production process layout are studied and a new layout will be developed to improve the efficiency and reduce the production cost. The major problem faced by the workshop is high flow intensity between machines which have high interrelationship. This leads to high travelling time and high travelling cost. Two alternative layouts are developed by using Systematic Layout Planning, which is a systematic way of generating layout alternatives. The alternative layout involves transferring the machines which have high interrelationship close to each other. The alternative layouts are evaluated using weighting placement value (WPV) and placement rating (PR) in Computerized Relationship Layout Planning (CORLAP) algorithm. The best alternative is chosen based on the performance measures which have the most significant improvement, total travel distance, total travel time, total travel cost, number of cross-over, output, average resource utilization, total average WIP level, total average waiting time and total time spent in the system. The constructed layout of the workshop efficiency is 30.16% while the alternative 1 and alternative 2 layouts is 71.4% and 73% respectively. The annual production saving cost of the alternative layout is 34,982 birr.

2014 Recent Advances in Engineering and Computational Sciences (RAECS)

Harsh Singh

IOP Conference Series: Materials Science and Engineering

Winnie Septiani

trilok kumar

International Journal of Engineering and Technology

a. watanapa

RELATED PAPERS

Brazilian Archives of Biology and Technology

Roberto Barbosa Bazotte

Konstantina Mouzaki

Ökologisches Wirtschaften

Dorothee Braun

Médiations et médiatisations

Min-Hsun Chiang

Sendimas 2021 - Seminar Nasional Pengabdian kepada Masyarakat

Gidion Putra Adirinekso

International Journal of Robust and Nonlinear Control

Ivan Ivanov

Proc. of 2002 International …

Marek Perkowski

Jorge Luis Gonzalez Gil

Ahlame BEGDOURI

The journal of the American Academy of Psychiatry and the Law

RICHARD WILLY DIEGO MARTINEZ

Estudios Socio-Jurídicos

Laura Porras-Santanilla

Journal of Organometallic Chemistry

Prashant Jadhav

Energy Conversion and Management

Muhammad Usman

Physical Review Letters

Rohit Parikh

Revista UNIANDES de Ciencias de la Salud

micaela carrillo

Construction and Building Materials

Mohamed Omar

Emilio Mari

Review of Scientific Instruments

Shivendu Prashar

Journal of Evaluation in Clinical Practice

Paul E Mintken

American Journal of Hypertension

Hélène Girouard

Yosra Yousif

Journal of Medical Internet Research

Matthew Fenech

Annals of Oncology

See More Documents Like This

  •   We're Hiring!
  •   Help Center
  • Find new research papers in:
  • Health Sciences
  • Earth Sciences
  • Cognitive Science
  • Mathematics
  • Computer Science
  • Academia ©2024

IMAGES

  1. Plantae

    plant layout research paper

  2. Research Paper template

    plant layout research paper

  3. Figure 1 from Analysis Plant Layout Design for Effective Production

    plant layout research paper

  4. Amazing Concept Plant Layout

    plant layout research paper

  5. Sample MLA Research Paper

    plant layout research paper

  6. Ornamental Plants Research Paper

    plant layout research paper

VIDEO

  1. Plant Layout and factors affecting plant layout [By: Er. C. S. Nagendra]

  2. Process Plant Design: Block Diagram

  3. paper plant|DIY

  4. Plant Layout & Maintenance

  5. 🧻TOLIET PAPER PLANT?!🧻 #farming #gardening #trending #organic #rareplants #floridagardening

  6. Paper flowers plant carft idea YouTube short video. #arijitsingh

COMMENTS

  1. (PDF) PLANT LAYOUTS' ANALYSIS AND DESIGN

    The paper provided a detailed definition of plant layout; and listed efficient labour utilization, manufacturing and maintenance ease, enhanced productivity, manufacturing flexibility, effective ...

  2. (PDF) A LITERATURE REVIEW ON EFFICIENT PLANT LAYOUT DESIGN

    Kumar (2010) mentions that effective facility layout design can result in reduced inventory, shorter lead times, and improved quality, among other benefits. There are several types of facility ...

  3. Facility layout planning. An extended literature review

    Facility layout planning (FLP) involves the process of physically arranging all the production factors that make up the production system so it can suitably and efficiently comply with the organisation's strategic objectives. As part of business operational strategies, FLP is considered one of the most important design decisions (Ghassemi ...

  4. Full article: Productivity improvement of a manufacturing facility

    Facility layout design has major influence on plant productivity. The purpose of layout design is to find the most effective facility arrangement and minimize the material handling. It has remained an active research area during recent decades (Allegri, Citation 1984; Meller & Gau, Citation 1996; Tarkesh, Atighehchian, & Nookabadi, Citation ...

  5. (PDF) A study to improve plant layout design for ...

    This research paper aims to study and improve the current plant layout and are analysed & designed by using string diagram. An Attempt is made to simulate the current and proposed factory layout ...

  6. Processes

    This paper presents two novel solution approaches for addressing large-scale multi-floor process plant layout problems. Based on the mixed integer linear programming (MILP) model, the first solution approach employs a multi-directional search strategy while the second improves solution efficiency by reducing model size through an iterative framework. Both approaches determine the spatial ...

  7. A study to improve plant layout design for minimizing ...

    Paper • The following article is Open access. A study to improve plant layout design for minimizing production costs. ... In this research, problems with a current plant layout are assessed with an eye to increasing productivity with minimum additional outlay. The aim is to improve the work flow in a pulley plant based on consequential ...

  8. Process Plant Layout Optimization: Equipment Allocation

    This paper provides (a) the most comprehensive model ever reported in the literature for spatially arranging the equipment, and (b) a Large Neighbourhood Search framework that enables complete solvers explore much larger neighbourhoods than previous approaches to this problem. Designing the layout of a chemical plant is a complex and important task. Its main objective is to find a most ...

  9. A Systematic Literature Review of Facility Layout Problems and

    The results in this section focus on answering the three research questions posed in the current systematic literature review. Thus, Table 2 answers the first research question, "What models are considered in an optimal plant layout design (FLP)". It includes the models of the 130 articles studying FLP.

  10. Manufacturing Plant Layout Improvement: Case study of a High

    The objectives of this research are to a) improve the layout of a job shop production plant and b) enhance the flow of material from one station to another station to reduce lead times and enhance energy management. This paper focuses on a high-temperature heat treatment tooling manufacturer located in Northeast Indiana, USA.

  11. A study of the layout planning of plant facility based on the timed

    The purpose of this research is to solve the problems of unreasonable layout of the production plant, disorder of the logistics process, and unbalanced production line in discrete manufacturing plants. By analyzing the production process and characteristics, the timed Petri net model is constructed according to the function and connection of each production unit, which is then used to generate ...

  12. (PDF) Layout optimization methods and tools: A ...

    Abstract and Figures. Purpose: This article aims to show the methods used to optimize layout and tools that have been applied since 2010 in the most diverse production environments. Theoretical ...

  13. Analysis Plant Layout Design for Effective Production

    This research aims to improve the plant layout of pulley's factory to eliminate obstructions in material flow and thus obtain maximum productivity. The present plant layout and the operation process of each section (i.e. sand mold, core ware house, core making, disassembly surface finishing, furnace, and inspection sections) have been investigated. The problem in term of material flow of each ...

  14. Layout Design for a Low Capacity Manufacturing Line: A Case Study

    The remainder of the present paper is organized as follows: in section 2 the principal layout design methods are presented; section 3 gives the case study analysis and the description of its manufacturing process; the results of the analysis are explained in section 4, while the fifth section provides a discussion of the results and presents ...

  15. Plant Layout Improvement Using CRAFT: A Case of Food ...

    In a research conducted by Okpala and Chukwumuanya, the authors looked at plant layout designs that enhance labour utilisation efficiency, ease of production, and simplicity of maintenance. ... In order to achieve the objective of this paper, we first have selected an existing industry in the country that is Ramu-Agri Industry Limited (RAIL) in ...

  16. PDF Plant Layout Improvement Using CRAFT: A Case of Food ...

    In a research conducted by Okpala and Chukwu-muanya, the authors looked at plant layout designs that enhance labour utilisation ... In order to achieve the objective of this paper, we first have selected an existing industry in the country that is Ramu-Agri Industry Limited (RAIL) in Madang ... Plant Layout Improvement Using CRAFT: A Case of ...

  17. A CASE STUDY ON IMPROVEMENT OF PLANT LAYOUT FOR ...

    This paper outlines the design, the layout, and the performance of the Dalby Desalination Plant, which provides 1.7 ML/d of potable water (approximately one third of the township's consumption ...

  18. Practical Plant Layout

    TLDR. This study demonstrates the application of the ARA and simulation in the design of the multi-floor layout, an aspect under-researched in existing studies and provides the practical implication suggesting that these techniques should be used together in the layout designs. 2. Highly Influenced.

  19. A study of the layout planning of plant facility based on the timed

    Based on the research in this paper, it can be known that the proposed improvement method can solve the problems of unbalanced equipment utilization, bottleneck, unreasonable plant layout, effectiveness of interaction between simulation model and actual production system etc. ... With the combined plant layout plan obtained by the SLP method, a ...

  20. A Case Study on Improvement of Plant Layout for Effective Production

    The final solution for a plant layout has designed to balance among the characteristics and considerations of all factors, affecting plant layout in order ... The objective of this research paper is to present an overview on a new combined methodology for the efficient improvement in productivity with the help of various tools, techniques and ...

  21. (PDF) Plant Layout -Types and Trends

    Plant layout can be understood as the arrangement of physical facilities and processes within the factory, in our case the example of sewing machines arrangement can be one. ... This is a research ...

  22. PDF Optimization of Plant Layout in Manufacturing Industry

    OBJECTIVE. The prime objective of research work is to design optimized plant layout, which will maximize the profit by arranging all the facilities to the best advantage of total manufacturing of the product. Any good planning is the best relationship between outputs, space and manufacturing cost.

  23. (PDF) PLANT LOCATION LAYOUT

    This research paper aims to study and improve the current plant layout and are analysed & designed by using string diagram. An Attempt is made to simulate the current and proposed factory layout ...